BERTH INFORMATION
The main inward shipping channel of the port divides in to the Ernakulam and Mattancherry channels .The Ernakulum Channel is 4.90 Km long, with the width varying from 250 to 500 m and has a draft of 12.5 m up to the Oil Terminal and Q8 / Q9 and a draft of 9.14 m up to the wharves and the north and south tanker berths.. The 1024 m long Ernakulam Wharf has six alongside berths, five for general cargo and a fertilizer berth. Besides there are three oil berths in the Ernakulum channel. The Mattancherry channel is 4.08 Km long, with the width varying from 180 to 250 m and a draft of 9.14 m except at Boat Train Pier where the draft is 10.0 m. On the Mattancherry Channel there are four alongside berths, for general cargo, one Boat Train Pier and two jetties for miscellaneous cargo. The details of the berths (including SPM) are shown below.
| BERTH / MOORING | Maximum Length overall (m) | Maximum Draft (m) | Maximum Deadweight (M/T) | Maximum Displacement (M/T) | Products Handled |
|---|---|---|---|---|---|
| SPM | 370 | 22.50 | 300000 | 340000 | Crude |
| COT | 250 | 12.50 | 115000 | 150000 | Crude / POL |
| NTB | 213 | 9.14 | 30000 | 40000 | POL |
| STB | 170 | 9.14 | 20000 | 27000 | POL |
| ERNAKULAM WHARF (Q5 - Q6) | 250 | 10.00 | 20000 | 27000 | Dry Cargo / CBFS |
| ERNAKULAM WHARF (Q7) | 250 | 10.50 | 20000 | 27000 | Dry Cargo |
| ERNAKULAM WHARF(Q8 - Q9) | 250 | 12.50 | 60000 | 80000 | Dry Cargo |
| FERTILIZER BERTH (Q 10) | 207 | 10.70 | 60000 | 80000 | Fertilisers / Phos. Acid |
| SCB | 170 | 9.14 | 15000 | 22000 | Liquid Bulk |
| NCB | 170 | 9.14 | 15000 | 22000 | Dry /Liquid Bulk |
| B.T.P | 200 | 10.00 | 35000 | 45000 | Dry /Liquid Bulk |
| MATTANCHERRY WHARF (Q1- Q3) | 180 | 9.14 | 16000 | 21000 | Dry Bulk |
| MATTANCHERRY WHARF (Q4) | 180 | 9.14 | 16000 | 21000 | Dry /Liquid Bulk |
| ICTT VALARPPADAM (V2-V3) | 320 | 14.5 | Containers |
CARGO STORAGE
Storage Facility
| COVERED AREA (Transit Sheds and Overflow sheds) | ||
|---|---|---|
| Location | Total Sheds | Area (Sq.m) |
| Mattanchery Wharf | 6 | 19160 |
| Ernakulam Wharf | 5 | 13200 |
| Container Freight Station | 1 | 10000 |
| Grand Total | 12 | 42360 |
| COVERED AREA (Warehouses) | ||
|---|---|---|
| Location | Total Sheds | Area (Sq.m) |
| Mattanchery Wharf | 4 | 11800 |
| Ernakulam Wharf | 1 | 2980 |
| Cement Godown | 1 | 1000 |
| BTP | 1 | 6000 |
| Grand Total | 7 | 1780 |
VACANCY POSITION OF COVERED STORAGE AREA AS ON 06.05.2013
PORT FLOTILLA
Tugs
The following tugs are available in Cochin Port and normally two tugs are used for each shipping movement as per the requirement of the Pilot. The cost of the tug is included in the Pilotage charges.
| TUG | BUILT | PROPULSION | BOLLARD PULL |
|---|---|---|---|
| BALAVAN | 1996 | Twin screw cycloidal | 32 Tons |
| BAALI | 1998 | Twin screw cycloidal | 32 Tons |
| VALLARPADAM | 2008 | Twin screw cycloidal | 45 Tons |
| VYPEEN | 2008 | Twin screw cycloidal | 45 Tons |
Tugs work with the Pilots on VHF Channel 14.
Mooring launches
Four mooring launches are available for passing mooring lines at Tanker, Coal and fertilizer (Q10) berths. On other berths mooring lines are passed by heaving lines.
Pilot Boats
2 Nos of Pilot boats of 13.5 m Length of Red Hull and White Superstructure with "PILOTS" embossed on the sides.
Dredgers
Grab Hopper Dredger NEHRU SHATABDI 1992 built with 1500 m3 hopper capacity.
Floating Crane
Periyar 1966 built self propelled crane of 100 M.T. SWL for use in the inner harbour only.
Water Barge
Jalaprabha 1996 built of 200 M.T. capacity for supply of F.W. to ships in Inner Harbour.
SERVICE FACILITY
Bunkering
Bunker supply can be done at all berths by barge/trucks/pipeline. All major oil companies undertake supplies which is arranged through agents.
Pipe Line Network
Separate pipelines laid at SCB & NCB for handling liquid cargo like Palmolien, CNSL (Cashew Nut Shell Liquid) and Chemicals. Pipelines are available at Tanker berths for handling Crude oil & Petroleum Products. At Q5, pipelines are laid for handling Carbon Black Feed Stock(CBFS). Flexible hoses are available for use at Tanker berths & NCB.
REPAIRS AND MAINTAINANCE
Facilities for Underwater Repairs
Port has a dry-dock facility. The size of the dock is 66M X12.5 M X 4 M which is available on hire subject to availability. The maximum size of the vessel that can be accommodated is 58M X10.5M with draft from 3.75 M to 4.2 M subject to tidal variations. Two nos.cranes of 5T capacity one at each side of the dock are available for supporting the docking activities. Facilities such as Fire line, shore power supply are available. All repairs, fresh water supply and garbage disposal are to be arranged by the vessel.
Dry-dock Tariff
| Sl.No | Activities | Charges ( Rs ) |
|---|---|---|
| 1 | Dry-dock hire charges Ist Day | 26,600/- |
| 2 | Dry-dock hire charges for every subsequent days | 13,300/- |
| 3 | Arranging Blocks | 36,000/- |
| 4 | Assisting docking/undocking | 15,000/- each |
| 5 | Providing Fire line per day | 1200/- |
| 6 | Crane's service per hour for each crane | 1750/- |
| 7 | Shore supply connection/Disconnection | 5000/- each |
| 8 | Electricity Charges | As per Port tariff |
Contact person
| Mechanical Superintendent | 0484 2666181 |
| Asst.Mech.Superintendent | 0484 2666871 Extn-2376 |
For availing dry dock facilitities the customer has to forward his request in the following format with the copy of Docking plan and G.A.Drawing.
| REQUEST FOR DRY-DOCK | ||
|---|---|---|
| Name & address of requesting Agency | : | |
| Name & address of owner of the vessel | : | |
| Name of Vessel | : | |
| Type of vessel | : | |
| Length overall | : | |
| Breadth | : | |
| Draft | : | |
| GRT | : | |
| Period of docking slot required | : | |
| No.of days required in the dock | : | |
SINGLE POINT MOORING
(For more information on SPM operations please refer to the details given under the 'Features' menu.)
Single Point Mooring for Crude Oil Import
Kochi Refineries Ltd (BPCl-KRL) has set up a Single Point Mooring System (SPM) as captive reception for the import of Crude oil. The facility is capable of receiving Very large Crude Carriers (VLCCs) of 300,000 DWT. The SPM is connected by a pipeline of 19.5 km to tank storage facilities at Puthuvypeen. The SPM is located at a water depth of 30 m, about 19 km from the coastline of Puthuvypeen. The depth of 30 m will allow 300000 DWT tankers with draughts of over 21 m to remain moored during virtually all wind and wave conditions. The SPM is connected to the shore by a 48 inch pipeline that runs to a storage facility comprising 4 tanks of 80,000 Kl each. The total area of the facility is 70 hectares, which provides room for two more storage tanks of 80,000 Kl capacity. The facility became fully operational in December 2007.
| Location | SPM: 18.7 km (10 Nm) off Puthuvypeen shore Shore Tank Farm: Puthuvypeen SEZ area |
| Land Area | 70 ha |
| Developer | BPCL-KR |
| Details of Facilities |
|
| Investment | Total Investment: Rs. 703.34 crores |
| Present Status | Facility has been operationalised in December 2007 |
MARPOL RECEPTION FACILITIES
|
No |
MARPOL 73/78 |
For category Of wastes |
Details of facility avaiable |
Capacity |
Remarks |
|
1 |
Annex-I |
Oil |
Five private firms approved by Central and State pollution control boards. |
Total capacity 45,500 KL/annum |
Service may be availed by directly contacting refiners or through local agents. Ref. Circular of Reception Facilities for slops/ waste oil from ships. |
|
2 |
Annex-II |
Noxious liquid substances |
Nil |
Nil |
As trade in chemicals through Cochin Port is very limited there are no facilities at present. However cargo receivers are required to arrange for reception of tank washings for vessels requiring pre-wash to be discharged ashore. |
|
3 |
Annex-IV |
Sewage |
Treatment facility available for Cruise vessels and Passenger ships. |
130 KLD |
Service arranged by local agents. |
|
4 |
Annex-V |
Garbage |
Private contractors approved by port. |
Delivery taken either by boat or by truck |
Arranged by agents. |
Circular of Reception facilities for slops/waste oil from ships